Mt Crosby Water Treatment Plant - Eastbank High Level Reservoir Roof
The purpose of this Reqest for Capability (RFC) is to identify suitably qualified construction contractor or construction contractor/consultant groups that have the experience and resources to undertake the design and construcion of a roof structure over the High Level Reservoir at Mt Crosby Water Treatment Plant Eastbank in accordance with the Design Brief (See Part 2 - Design Brief).
Site Visit: Thursday 02 May 2013 - Mt Crosby Water Treatment Plant (refer to Addenda 1).
20 May, 2013
Civil engineering - (70%)
Structures and Building and Construction and Manufacturing Components and Supplies - (30%)