Proserpine River Boat Ramp Upgrade and Floating Walkway
The Contract includes the supply of all plant, labour and materials necessary to complete the Works in accordance with this Specification, Particular and General Conditions of Contract and the Drawings.
The major items included in the Works are:
1. Design of the floating walkway (including construction drawings and design report). 2. Earthworks (fill) to construct a ramp core wider and higher than the existing surface. 3. Construction of a cast insitu concrete connecting slab (27.5 x 10.6 metres) including walkway abutment. 4. Supply and place 88 x 4000 wide precast reinforced concrete planks (2 boat ramp lanes x 44 planks). 5. Supply and place 2500 wide precast reinforced concrete planks to suit abutment design. Quantity to be nominated by Contractor. 6. Supply and drive restraining piles for floating walkway. 7. Supply and install floating walkway modules. 8. Fit out walkway including safety barrier and lighting. 9. Shoulder works including grouted stone pitching and loose 75 mm crushed rock.
30 Aug, 2013
Building and Construction and Maintenance Services - (100%)