The Contract includes the supply of all plant, labour and materials necessary to complete the Works in accordance with this Specification, Particular and General Conditions of Contract and the Drawings.
The major items included in the Works are as follows:
Separable Portion A- Flood repairs to Tarcoola Drive: 1. Saw cut and remove existing ramp to the specified location shown on the drawings 2. Trim surface to the design profile 3. Supply and install crush rock 4. Supply and install concrete abutment 5. Supply and install planks 6. Construct grouted shoulders 7. Remove existing signs and supply and install new signs 8. Complete “As constructed” surveys and drawings
Separable Portion B- Flood repairs to David Bray Park: 1. Saw cut and remove existing ramp to the specified location shown on the drawings 2. Trim surface to the design profile 3. Supply and install crush rock 4. Supply and install concrete abutment 5. Supply and install planks 6. Construct grouted shoulders 7. Remove existing signs and supply and install new signs 8. Complete “As constructed” surveys and drawings
Separable Portion C- Widening works to David Bray Park: 1. Prepare existing ramp for widening works 2. Trim surface to the design profile 3. Supply and install crush rock 4. Supply and install concrete abutment 5. Supply and install planks 6. Construct grouted shoulders & concrete infill between existing ramp and new works 7. Complete “As constructed” surveys and drawings
|