Ross Creek Upstream and Downstream Boat Ramps Floating Walkway Construction
The Contract shall include the supply of all plant, equipment, labour and material necessary for the execution of the whole of the Works required for the Ross Creek Upstream and Downstream Boat Ramps Floating Walkway Construction, all in accordance with this Specification, Particular and General Conditions of Contract and the Drawings.
The major items included in the Works are:
Design floating walkways
Prepare constructions drawings and design report for floating walkways
Supply and fabricate floating walkway modules and associated components
Supply and install floating walkway piling including polyethylene sleeves
Prepare handover documents
25 Mar, 2014
Building and Construction and Maintenance Services - (100%)