This offer is for the hydro-blasting of in-situ bridge concrete bridge kerb on Sandy Creek Bridge, 12.5km north of Apple Tree Creek on the Bruce Highway (Maryborough – Gin Gin).
The bridge rail on Sandy Creek Bridge is to be removed and replaced. The purpose of this offer is to enable the removing of the concrete at each bridge rail post without damaging the steel reinforcement.