Detailed Design - Mt Crosby East Bank Water Treatment Plant Centrifuge Upgrade
The objective of the project is to increase the capacity of existing solids handling facilities at Mt Crosby East Bank Water Treatment Plant (WTP) in order to have sufficient solids processing capability available for dealing with possible high raw water turbidity events during upcoming wet seasons.
The scope of works for this contract is inclusive but not limited to the following:
Detailed design is inclusive of
Structural
Civil
Mechanical
Electrical, Instrumentation and Control system upgrade
For Construction drawings; and
Construction specification.