Detailed Design - Mt Crosby East Bank Water Treatment Plant Centrifuge Upgrade  

Seqwater
ICON Ipswich, 117 Brisbane Street, Ipswich, QLD, 4305, , Australia
01846RFP
Detailed Design - Mt Crosby East Bank Water Treatment Plant Centrifuge Upgrade (01846RFP)
Goods and Services
Detailed Design - Mt Crosby East Bank Water Treatment Plant Centrifuge Upgrade

The objective of the project is to increase the capacity of existing solids handling facilities at Mt Crosby East Bank Water Treatment Plant (WTP) in order to have sufficient solids processing capability available for dealing with possible high raw water turbidity events during upcoming wet seasons.

The scope of works for this contract is inclusive but not limited to the following:

  • Detailed design is inclusive of
  • Structural
  • Civil
  • Mechanical
  • Electrical, Instrumentation and Control system upgrade
  • For Construction drawings; and
  • Construction specification.
19 Dec, 2014
Building and Construction and Maintenance Services - (100%)
open offer process
No
$416,396 (Estimate)
South East Queensland
26 Mar, 2015
5
Alesha McClelland
OFFICE: (07) 3035 5693
alesha.mcclelland@seqwater.com.au

Contractors

Cardno (Qld) Pty Ltd
Level 11, 515 St Paul's Terrace, Fortitude Valley , QLD, Australia, 4006
Price: $ 0.00