Supply & Deliver road paving materials and screenings for Three Moon Creek Side track
REQUIREMENTS & TIMING
Type 2.2 - 1000 tonne for side track
Select Fill – 1500 tonne (provisional quantity) side track
10mm Pre-coated screenings – 25 tonnes
Bedding Sand – 100 tonne
150-200mm Rock – 200 tonne (provisional)
Note: All granular products will be required to be delivered direct on road, whereas the screenings will be delivered into stockpile.
Anticipated requirement is that the gravel will be required at a rate of 750 tonne/day.
|