The supply and delivery to site of premixed concrete products as below, both during and out of standard working hours, over multiple pours with full loads expected:
100m3 TMR S40/20 concrete, 100mm slump, to be pumped.
TMR Standard Specifications (available on the TMR website) and Australian Standards:
- MRS/MRTS70 – Concrete AS1379 (2007)
- Quarry and concrete mix approvals gained and forwarded;
- Previous test results supplied or successful trial mix completion;
Delivery to site of compliant product for each pour.
Wide Bay Highway, approx. halfway between Bauple-Woolooga and Gympie-Woolooga Roads (17.5km towards Kilkivan from the Bruce Highway/Wide Bay Highway intersection).
|