View Contract Details

Construction of the James Turrell lighting installation at the Gallery of Modern Art (GOMA)  

Corporate Administration Agency
Level 23, 111 George Street, Brisbane, QLD, Australia, 4000
QAGOMA0782017
Construction of the James Turrell lighting installation at the Gallery of Modern Art (GOMA) (QAGOMA0782017)
Works
Construction of the James Turrell lighting installation at the Gallery of Modern Art (GOMA)

The Queensland Art Gallery has a requirement to engage a suitably qualified contractor to undertake works for the construction of the James Turrell lighting installation.

The project involves the installation of approximately 1,000 light fittings within the cavity behind the existing glass façade of the Gallery of Modern Art (GOMA). The light fittings will illuminate the entirety of the glass façade on the southern and eastern sides of the building. The installation will be a permanent artwork acquisition for QAGOMA’s Collection, commissioned from internationally renowned artist, James Turrell (United States, b.1943).

  • The Project is to be delivered in two separable Portions. Refer to "Specification Documents" Section of this tender for full details.

MANDATORY REQUIREMENTS
The Principal will assess tenders to ensure they conform to the following mandatory requirements:

  • Full attendance by the Tenderer at the scheduled Mandatory Industry Briefing (MIB) / site inspection;
  • Completion in full and submission of all Response Schedules with tender submission
  • Minimum PQC3 Accredited Contractor
    • Tenderers are strongly advised to validate their PQC Accreditation including "Project Status" i.e. ensure eligibility to work within Museums/Galleries
    • Tenderers are required to validate their accreditation directly with PQC

MANDATORY INDUSTRY BRIEFING
A mandatory industry briefing (MIB) will take place at 2pm on Wednesday 20 September 2017 at the Gallery of Modern Art, which will be followed by a site inspection. 

  • To be eligible to submit a response, tenderers must attend the MIB
  • Refer Invitation to Offer, Item 6 Mandatory Industry Briefing for full details

CLOSING DATE AND TIME 
Submissions must be lodged Strictly by 2PM Australian Eastern Standard Time (Queensland) on Thursday, 05 October, 2017 by lodging hard copies as setout in Section 14 of the Invitation to Offer. Submissions lodged after 2pm are considered late.  Acceptance of Late Tenders will be subject to the Conditions of Tender.

5 Oct, 2017
General building construction - (100%)
open offer process
Yes
$1,415,612 (Fixed Price)
South East Queensland
8 Nov, 2017
10 Nov, 2017
2 Feb, 2018
1 Mar, 2018
Refer comments for successful tenderer.
6
Natalie Christie
caaprocure@caa.qld.gov.au

Contractors

Premis Solutions
PO Box 114, Toowong, QLD, Australia, 4066
Price: $ 1415611.60
Comments:
The Contract Price includes both Separable Portions 1 and 2. Should the customer accept delivery of SP2, the final completion date will be 1/3/18 otherwise SP1 completion is 2/2/18.