The Scope of Works is for the refurbishment of the Callide C4 Cooling Tower Structural Repair and includes:
design
manufacture
quality assurance and documentation
inspection and testing
delivery
installation
defects liability
Callide C4 Unit 3 was originally commissioned in 2001
The Principal has initiated a major overhaul project for the Supply and replacement of all of the plywood sheeting that forms the floor of the Hot Water Basins (HWB) on all 18 cells of Unit 4 Cooling Tower of Callide Power Station.