Mackay Regional Council (MRC) requires suitably experienced Contractors to construct a 256m length of new water main to create a link in between the Ø200 main in Dutton St and the Ø200 main in Bold St, Walkerston. Within the full length of the new main, an approximately 214m section of Ø355 PE pipe will be laid crossing under the Bakers Creek using directional bore method and the remaining lengths using open trench method.
15 Feb, 2011
Building and Construction and Maintenance Services - (100%)