The Supplier is required to supply, install and commission a new 100kVA power supply, including metering provision and compliance to the electricity distribution provider’s (Ergon Energy) requirements at the existing Hopeland site 33kV supply point.
An underground supply line will need to be installed from the new metering point (located on exiting 33kV to 415V supply pole, to the existing Machinery Shed switchboard located approximately 100metres away (contractor to confirm at site visit).
The Supplier is required to manage all required correspondence with Ergon Energy as required for execution of the works. All ‘as constructed’ drawings and certification is to be provided at completion of the contract.
All existing (redundant) electrical equipment located on the supply pole is to be removed and relocated to a safe area adjacent to the existing GTL Plant switchboard as agreed with DNRME representative on site.
|