Demolition and Removal of Processing Plant and Associated Infrastructure  

Department of Natural Resources, Mines and Energy
Level 32, 400 George Street, Brisbane, QLD, Australia, 4002
LINC043
Demolition and Removal of Processing Plant and Associated Infrastructure (LINC043)
Works
Demolition and Removal of Processing Plant and Associated Infrastructure

The Contractor is to develop and propose the method by which all equipment, materials and scrap will be dismantled, removed and/or salvaged.  All methods must be to the Principal’s satisfaction and will require Principal approval.  Furthermore, the Contractor must:

  • Be appointed as the principal contractor for the Construction Project as per s292 and s293 of the Workplace Health and Safety Act 2011 (WHS Act) and provide evidence to demonstrate capability to act as the principal contractor.
  • Provide the Principal prior to mobilisation:
    • Return the executed Principal Contractor Appointment Form to the Principal identifying the work area the Contractor will have management and control of for the duration of the work.
    • Project Management Plan;
    • Baselined schedule including key milestones and practical completion date;
    • Workplace Health and Safety Management Plan (WHSMP) identifying all high risk construction work (s291 WHS Act) and compliance to principal contractor duties (Part 6.4 WHS Act);
    • Environmental Management Plan;
    • Project risk assessment (HSEQ) and associated risk register;
    • All Safe Work Method Statements (SWMS) for high risk construction work);
    • Safe Work Procedures (SWP/JSA’s/SWMS) relevant to contract
    • Copies of all relevant high risk work licenses and competencies;
    • Plant risk assessment for all Contractor Plant;
    • Site establishment and mobilisation plan;
    • Dismantling/demolition/decontamination/disposal plan demonstrating compliance with relevant Codes of Practice nominated in s1.3.4 of this Schedule.
    • Standard operating procedures (or equivalent) for tasks.
    • bridging document addressing differences between the Principal’s WHS system and the Principal Contractor’s WHS system,
    • site specific induction document
    • Principal Contractor’s site signage plan
    • HSEQ audit and inspection program
    • Evidence of all relevant workers competencies and licenses, including first aid.
    • Alcohol and drug testing program and procedure, with relevant competencies of competent person undertaking the testing.
    • details of incident and hazard reporting, investigation and corrective action procedures.
  • Remove and dispose of residual contaminants from the plant and associated infrastructure in a way that does not contaminate the land and that complies with regulatory requirements
16 Oct, 2019
Building demolition machinery and equipment - (100%)
limited offer process
No
$964,901 (Estimate)
South West & Darling Downs
18 Nov, 2019
Total Value of the contract is GST inclusive
9
Victor Mcleod
PHONE: (07) 46654097
0459865373
victor.mcleod@dnrme.qld.gov.au

Contractors

McMahon Services
14/1440 New Cleveland Road Chandler, Brisbane, QLD, Australia, 4157
Price: $ 0.00