Supply & Deliver road paving materials and screenings.
REQUIREMENTS & TIMING
1,000 tonne Type 2.1 Pavement Material
1,000 tonne Type 2.3 Pavement Material
25 tonne 10mm precoated screenings
60 tonne 14mm precoated screenings
It is generally intended that the paving materials will be delivered directly onto the road surface, with screenings into stockpile
All pavement materials are required in July 2022
|