The Gold Coast Waterways Authority is seeking Proposals for Dredging of the Coomera River and Seaway Entrance.
The project contains four Separable Portions of work:
SP1 - Dredging of the downstream section of the Coomera River (Sovereign Islands to Sanctuary Cove) and depositing offshore at Narrowneck
SP2 - Dredging of the midstream section of the Coomera River (Sanctuary Cove to BoatWorks) and depositing at the CDSMF
SP3 - Dewatering and disposal of dredged material via the Coomera Dredged Sediment Management Facility (CDSMF)
SP4 - Dredging of the Seaway Entrance and depositing offshore at Narrowneck
Detailed information on the scope of works is provided in "Section 3 - Here is the detail" below.
23 Mar, 2023
Building and Construction and Maintenance Services - (100%)