PDG463422
Closed
Tender
West Thornlands Active Pathway Link, Thornlands  specification documents
UNSPSC: General building construction - (100%)
released
3:19 PM , 19 Apr, 2022
closed
2:00 PM , 20 May, 2022

Agency Post #4       18 May, 2022 11:21 AM

Supplier Post  16 May 2022

Q1: Regarding BOQ line item 44 Supply & Install 1800mm high 150 dia. Timber Bollards

Q2: The referenced BSD notes 1800mm high 150 dia. Steel Bollards

Q3: Please confirm that bollards are to be powdercoated steel?

Q4: BOQ line item 45 Supply & Install Guide Posts, please provide details and confirm the locations of required guide posts.

RCC Response - 18 May 2022

Q1: Refer to Addendum 2: Amended BOQ has been uploaded and is entitled 'PDG-46342-2 Section B Attachment H2 Bill of QuantitiesV2' and must be used by tenderers when submitting their responses.

Q2: Yes, as per BSD-5003 Sheet 3 of 3.

Q3: Yes, refer to Addendum 2: Document entitled 'PDG-46342-2 BSD Shared Path Standard Entrance Sheet 2of3' has been uploaded.

Q4: Guide posts to be located in ground adjacent to head walls (headwalls locations as shown on, For Construction Drawing Set, sheets 46342-11 & 46342-12), set back 1m from path edge.

Agency Post #3       9 May, 2022 10:34 AM

Supplier Post 1#   06 May, 2022   11:13am

Can an extension to the closing date till the 20th May be considered? As the electrical works are required to be completed by an Energex approved contractor our subcontractors have requested additional time.

 

RCC Response - 09 May 2022:

An extension to 20th May 2022 at 2pm has been granted.

 

 

Agency Post #2       6 May, 2022 11:47 AM

Supplier Post  05 May 2022 12.43 PM

The Energex pavement detail on drawing 46342-29 shows 125mm CBR15 sub base. Can you please confirm if the supply and installation of the sub base is to be priced in the concrete line item line 36 or if this is included under the provisional lines 71 & 72 provided in the BOQ?

 

RCC Response - 06 May 2022  11.43 AM

Addendum One has been uploaded and includes a revision to Page 29 (only) of Appendix A RCC For Construction Drawing Set Rev.A .

  • The Energex pavement detail on drawing 46342-29 shows 125mm CBR15 sub base - Updated detail as per Appendix A Rev.B (Page 29 only).
  • Can you please confirm if the supply and installation of the sub base is to be priced in the concrete line item line 36 or if this is included under the provisional lines 71 & 72 provided in the BOQ? - It is included in provisional lines 71 & 72, not concrete line 36.

 

 

   
Supplier Post #2       6 May, 2022 11:13 AM

Good morning,

Can an extension to the closing date till the 20th of May be considered? As the electrical works are required to be completed by an Energex approved contractor our subcontractors have requested additional time.

Thank you for your consideration.  

Agency Post #1       21 Apr, 2022 10:44 AM

SupplierPost #1     20 Apr, 2022 10:58 AM

Can you please confirm if additional detail or a specification is available for this project outlining nominated suppliers & finishes for items including: bollards, solar lights, concrete colours etc..

Also in regards to the electrical and lighting works, are all portions to be priced for completion during this stage of works or only at the locations where new pathways are installed under this stage of works (e.g. complete works at intersections of Swallow Street & Lorikeet Drive)?

 

RCC Response - 21 Apr, 2022:

No nominated suppliers provided.

Bollards: Refer to Appendix H BCC standard Drawing BSD-5002. Solar lights: To comply with BCC S156 https://www.brisbane.qld.gov.au/planning-and-building/planning-guidelines-and-tools/planning-guidelines/reference-specifications .  Concrete colours: Refer to Appendix A RCC For construction Drawing 46342-02.

Two (2) priority crossings only (ie South St/ Swallow St intersection & South St/ Lorikeet Drive intersection).

 

Supplier Post #1       20 Apr, 2022 10:58 AM

Good morning,

Can you please confirm if additional detail or a specification is available for this project outlining nominated suppliers & finishes for items including: bollards, solar lights, concrete colours etc..

Also in regards to the electrical and lighting works, are all portions to be priced for completion during this stage of works or only at the locations where new pathways are installed under this stage of works (e.g. complete works at intersections of Swallow Street & Lorikeet Drive)? 

If you could clarify it would be greatly appreciated. Thank you. 