Published 24 Nov, 2022
|
|
20221118 Preliminary Investigations - RevB_Extracted
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
As Built Drawing Records Procedure
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Automation Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Backflow Prevention Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Cable Numbering System
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Civil Design Guidelines
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Coating and Corrosion Protection Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Electrical Design Requirements
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Electrical Equipment Labelling
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Electrical Installation Requirements
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Electrical Switchboards
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Equipment Identification Signs Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Equipment Specific Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
GAWB Drafting Standards and Drawing Management System
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
GAWB Site Numbers
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
General Signage
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
General Specification for High Voltage and Low Voltage Motors
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
GPS Field Data Collection
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
GWTP Control Functional Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
GWTP HL Switchboard Replacement Control Functional Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Hydrostatic Pressure Testing of Treated and Raw Water Pipelines
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Numerical Computer Modelling Procedure
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Pipeline Construction Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Polyethylene Pipeline Welding Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Preferred Electrical and Instrumentation Equipment
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Preferred Equipment Supplier - Valves Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
RF002168 - Part 1 - ITO Conditions
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
RF002168 - Part 2 - Scope of Work
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
RF002168 - Part 3 - Contract Conditions
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
RF002168 - Part 4 - Returnable Schedules
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
RF002168- Returnable Schedule - Schedule 11 - Price Schedule
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Security Fencing Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Specification Asset Naming and Number
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Submission of Drawings
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Technical Standards and Engineering Specifications Procedure
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Valve Pit Access Covers and Grates
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Valves Penstocks and Stopboards
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Walkways Platforms and Handrails Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Water Supply Connections Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Welding Specification
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Working with Asbestos Cement Pipe
(Ver 1 - 24 Nov, 2022)
Available by Download
|
|
Disinfection and Testing of Treated Water Pipelines
(Ver 1 - 24 Nov, 2022)
Available by Download
|
Published 30 Nov, 2022
|
|
RF002168 - Addendum 1
(Ver 1 - 30 Nov, 2022)
Available by Download
|